Contact Us
Login
Menu

BC Hydro Bridges

Client: BC Hydro

Project: Supply & Installation of one 5 meter concrete slab permanent bridge and one 11.450 meter temporary log stringer bridge on remote access roads.

 

     

     

   

I worked with PVL on a project retrofitting two three storey apartment buildings containing 44 suites. The retrofit involved stripping the buildings down to the framing and completely refinishing. PVL came to this project at a difficult time after it had been abandoned part way through and left in disarray. By being well organized and efficient PVL was able to get the project moving again for a reasonable cost and within a fairly short time frame. 

Erika Gerson, MAIBC
Boni Maddison