Haisla Cell Tower

Client: Haisla Business Operations

Project: Progressive Ventures assisted with the construction of the on-ground infrastructure for this project, which will bring cell service to the Village. This entailed creating a 0.5km access road through steep, rough terrain, clearing and preparing the site for the tower, pouring the concrete tower pad, and constructing a small equipment shed.  The job required innovative solutions to engineer the road in a cost effective way yet still get a concrete truck up to the site.  The pad site itself had to be located in a fairly exact spot and be perfectly level.

Scope of the project was adding 11,500 sq ft of new facility in addition to an inside / outside renovation of 21,000 sq ft of existing building.  The final result was a most impressive modernized dealership that was completed 30 days ahead of schedule and on budget.

Brian Kennedy, Terrace Totem Ford Sales