Contact Us
Login
Menu

Pacific Trails Pipeline Terrace Camp

Client: Falcon Camps (Pacific Trails Pipilines and Chevron)

Project: Our scope of work was to repair berms, fall and clear remaining trees, install 2.6 Km of 8' chain link fencing with barbed wire, install four 24 foot vehicle access gates, two 12 foot vehicle access gates andfive man gates with panic hardware.

Scope of the project was adding 11,500 sq ft of new facility in addition to an inside / outside renovation of 21,000 sq ft of existing building.  The final result was a most impressive modernized dealership that was completed 30 days ahead of schedule and on budget.

Brian Kennedy, Terrace Totem Ford Sales